A Project Manager’s view: Comparing the two Gantt Chart options in Enterprise Architect
Comparing the features of EA’s native Gantt with the Project Builder Gantt chart, part of eaTeamWorks Portfolio Manager
Gantt Charts in EA - a comparison
Topic | EA’s built-in Gantt | Portfolio Manager / Project Builder |
---|---|---|
Main purpose | Shows work and resource allocations on EA elements; good for tracking who is doing what and when. (sparxsystems.com) | Adds a project plan view inside EA, designed for multi-project work with impact checks and model links. (eaTeamWorks) |
What it’s based on | Resource tasks assigned to elements; often edited with the Assign Resources dialog. (sparxsystems.com) | Tasks you create in the plan; tasks can be linked to model elements via Dependency connectors and shown in Related Elements. (eaTeamWorks) |
Dependencies | Docs focus on allocations and WBS; precedence links (FS/SS) are not a core theme. (sparxsystems.com) | Finish–Start links are first-class: moving a predecessor updates successors; connectors can be created directly in the chart. (eaTeamWorks) |
Editing the chart | Visual duration bars + filters; fine details via Resource Allocation window. (sparxsystems.com) | Drag to move/resize tasks, draw links, delete links in the chart; table + chart stay in sync. (eaTeamWorks) |
Integration with model | Shows work on elements and percent-complete/resource columns. (sparxsystems.com) | Deep model integration: icons/links to requirements, risks, issues, tests; jump between plan and model. (eaTeamWorks) |
Multi-project management | Not positioned for simultaneous projects in one repository. (General project mgmt domain docs only.) (sparxsystems.com) | Built for many projects in one model with real-time impact assessments and warnings. (eaTeamWorks) |
EA’s native Gantt is strongest for resource-centric tracking on model elements. The Portfolio Manager add-in delivers a planning-centric, multi-project Gantt that adds dependencies, richer model links, and impact awareness—while staying inside EA.
More Insights
Project Management with EA
21 August 2025
EA has tasks/risks/issues and a Gantt but no dependency lines. Gantt shows any elements—use tasks as primary, link requirements; strong traceability.
Learn MoreWhy did we write Portfolio Manager?
22 June 2023
To give modelers visibility of dependencies and impacts between projects.
Learn MoreWhat AND why
8 November 2022
Making maximum use of our EA information, to show not just what the world looks like now, but why as well.
Learn MoreSolution Architecture using Enterprise Architect
6 October 2022
Ian's presentation to the EA Global Summit on September 15th 2022
Learn MoreProject Lifecycles and Portfolio Manager
23 June 2022
How to integrate the Portfolio Manager lifecycle with waterfall and agile development methodologies
Learn MoreBranching and Impact Analysis
15 June 2022
How to start your project in EA by copying from the as-is model - with Portfolio Manager
Learn MoreIntroduction to Portfolio Manager
14 June 2022
A new approach to delivering a single version of the truth across many projects all working in the same Sparx EA model repository.
Learn MoreStructure, Locking and the Portfolio Manager State Model
9 June 2022
Portfolio Manager basics: Package structures, model locking and element state model
Learn MoreInside Portfolio Manager
19 May 2022
Portfolio Manager uses lots of EA features, which means it looks nothing like the code-based version control you are used to. Here is how PM works.
Learn More